Explain Four phases of ISMS

Avatar 37a3bd7bc7328f0ead2c0f6f635dddf60615e676e6b4ddf964144012e529de45 Chirag asked almost 3 years ago

    3       0 Answer Now Comment Report
3 Answers
Avatar 37a3bd7bc7328f0ead2c0f6f635dddf60615e676e6b4ddf964144012e529de45 Pankaj answered almost 3 years ago

•The Plan Phase– This phase serves to plan the basic organization of information security, set objectives for information security and choose the appropriate security controls (the standard contains a catalogue of 133 possible controls). •The Do Phase– This phase includes carrying out everything that was planned during the previous phase. •The Check Phase – The purpose of this phase is to monitor the functioning of the ISMS through various “channels”, and check whether the results meet the set objectives. •The Act Phase – The purpose of this phase is to improve everything that was identified as non-compliant in the previous phase.

    1       0 Comment Report
rajendra commented about 2 months ago

Appreciable !!

Important Note – Preparing for CS Professional?
CAKART provides Indias top faculty each subject video classes and lectures – online & in Pen Drive/ DVD – at very cost effective rates. Get video classes from CAKART.in. Quality is much better than local tuition, so results are much better.
Watch Sample Video Now by clicking on the link(s) below – 
For any questions Request A Call Back  
Avatar 37a3bd7bc7328f0ead2c0f6f635dddf60615e676e6b4ddf964144012e529de45 Ashika answered almost 3 years ago

These phases are given as follows: •The Plan Phase– This phase serves to plan the basic organization of information security, set objectives for information security and choose the appropriate security controls (the standard contains a catalogue of 133 possible controls). •The Do Phase– This phase includes carrying out everything that was planned during the previous phase. •The Check Phase – The purpose of this phase is to monitor the functioning of the ISMS through various “channels”, and check whether the results meet the set objectives. •The Act Phase – The purpose of this phase is to improve everything that was identified as non-compliant in the previous phase.

    0       0 Comment Report
Open uri20170510 32134 1c996lj?1494421732 Anil answered almost 3 years ago

**Four phases of ISMS:** ISO 27001: 2005 prescribes ‘how to manage information security through a system of information security management’. Such a management system, just like ISO 9001 or ISO 14001, consists of four phases that should be continuously implemented in order to minimize risks to the CIA of information. These phases are given as follows: ---------------------------------- •The Plan Phase– This phase serves to plan the basic organization of information security, set objectives for information security and choose the appropriate security controls (the standard contains a catalogue of 133 possible controls). •The Do Phase– This phase includes carrying out everything that was planned during the previous phase. •The Check Phase – The purpose of this phase is to monitor the functioning of the ISMS through various “channels”, and check whether the results meet the set objectives. •The Act Phase – The purpose of this phase is to improve everything that was identified as non-compliant in the previous phase.

    0       0 Comment Report
Get Notifications
Videos
Books
Notes
Loading
SIGN UP
Watch best faculty demo video classes

These top faculty video lectures will
help u prepare like nothing else can.